Cost index of civil engineering works 2022, November
Costs of civil engineering rose in November 2022 by 12.6 per cent from one year ago
releaseAccording to Statistics Finland, the costs of civil engineering rose by 12.6 per cent from November 2021 to November 2022. The annual change in costs varied by sub-index from 15.2 per cent for rock structures to 6.6 per cent for concrete structures.
Content is being loaded
Key selections
- The costs of civil engineering rose by 12.6 per cent from one year back.
- The annual change in costs varied by sub-index from 15.2 per cent for rock structures to 6.6 per cent for concrete structures.
- Examined by cost factor, the biggest cost increases occurred in the costs of own machinery (28.1%) and material costs (11.0%).
- The total index went down by -0.3 per cent from the month before.
Tables
See key statistical data in the tables.
Cost index of civil engineering works 2015=100 indices by structure, November 2022
Cost index of civil engineering works 2015=100, totalindex by cost factor, November 2022
Database tables
Pick the data you need into tables, view the data as graphs, or download the data for your use.
Updated database tables
114x
Statistics:
Updated:
Statistics:
Updated:
Statistics:
Updated:
119r
Statistics:
Updated:
119t
Statistics:
Updated:
Statistics:
Updated:
Statistics:
Updated:
Statistics:
Updated:
Future releases
Content is being loaded
Referencing instructions
Official Statistics of Finland (OSF): Cost index of civil engineering works [online publication].
Reference period: 2022, November. Helsinki: Statistics Finland [Referenced: 21.6.2026].
Access method:
Related topics
Contact information
Service email
kui.tilastokeskus@stat.fiInquiries primarily
Aaro Laakkonen
Senior Statistician
029 551 3868
Head of Department in charge
Hannele Orjala
Head of Department in charge
029 551 3582